The process of replacing a large-capacity battery with an uninterruptible power supply (UPS): 1. The construction workers bring the installation and testing tools to the computer room construction site. 2. Check to confirm that the sleeve handle and wrench handle are well insulated. 3. Plug the generator output line into the backup power industrial connector, start the generator, and let the generator run first. 4. Open
The process of replacing large-capacity battery with uninterruptible power supply UPS
1. The construction personnel bring the installation and testing tools and arrive at the computer room construction site.
2. Check to confirm that the sleeve handle and wrench handle are well insulated.
3. Plug the generator output line into the backup power industrial connector, start the generator, and let the generator run first.
4. Open the battery cabinet and take photos for backup. Find the output cable connected to the UPS host and confirm the positive and negative poles.
5. Confirm that the generator is running stably. After measuring the normal voltage at the input end of the transfer switch in the distribution cabinet, switch the switch to the generator side, observe and confirm that the UPS host is running normally, and disconnect the battery circuit breaker in the battery cabinet.
6. Remove the old battery. Remove the battery from top to bottom on the battery rack. Remove one screw and wrap the connecting wire connector with electrical tape to insulate it well (this step is very important, don’t be lazy) to prevent it from being damaged. The negative pole is short-circuited and dangerous.
7. Remove all batteries, place them in place, and start installing new batteries.
8. Start from 1# according to the battery number, and start installation from the bottom layer of the battery rack. The position and direction are the same as before. The connector screws must be tightened, the connecting wires are neat and the curvature is consistent. There should be appropriate gaps between batteries, and strict precautions should be taken during the connection process. short circuit.
9. After installing the battery, confirm that the positive and negative poles are correct, measure the total voltage, and confirm that the battery is installed and connected correctly.
10. Calculate the charging voltage based on the battery parameters, and measure the UPS output charging voltage, which meets the charging requirements of this batch of batteries. Close the battery cabinet and check the host charging menu. The battery is already charging.
11. Install the battery cabinet, switch the input of the UPS host back to the mains power, and confirm that the input and output voltage of the UPS uninterruptible power supply host is normal. Stop the generator, disconnect the connecting wires, pack the tools, load the old battery into the truck for transportation back, and clean up the site.
Popular recommendation
6LR61 alkaline battery.How does temperature change affect the charging and discharging of lithium ba
2023-10-103.7V 18650 lifepo4 battery.Interpretation: Where do domestic lithium battery pack technologies still
2023-10-08LR721 battery.Battery technology is still difficult to break through
2023-10-1418650 li ion battery.What is the production process of ternary cathode materials for lithium-ion bat
2023-10-08lithium battery 18650 3.7v.A brief discussion on the basic principles of charging and discharging 18
2023-10-13802540 polymer battery.Let’s take a look at several technical points related to cylindrical batterie
2023-10-08LR726 battery!A push-pull inverter vehicle switching power supply circuit design scheme
2023-10-08LR921 battery.Detailed introduction to the principle of mobile phone battery circuit
2023-10-08LR6 battery!Causes and solutions to common problems in PCB alkaline etching
2023-10-08What is the difference between ordinary batteries and lithium batteries?
2022-11-08Nickel Hydride No. 5 battery.Breakthrough in the synthesis of Wanxiang ternary high-nickel single cr
2023-10-08battery aaa alkaline.Research progress on metallurgical treatment of waste nickel-cadmium batteries
2023-10-09