The process of replacing a large-capacity battery with an uninterruptible power supply (UPS): 1. The construction workers bring the installation and testing tools to the computer room construction site. 2. Check to confirm that the sleeve handle and wrench handle are well insulated. 3. Plug the generator output line into the backup power industrial connector, start the generator, and let the generator run first. 4. Open
The process of replacing large-capacity battery with uninterruptible power supply UPS
1. The construction personnel bring the installation and testing tools and arrive at the computer room construction site.
2. Check to confirm that the sleeve handle and wrench handle are well insulated.
3. Plug the generator output line into the backup power industrial connector, start the generator, and let the generator run first.
4. Open the battery cabinet and take photos for backup. Find the output cable connected to the UPS host and confirm the positive and negative poles.
5. Confirm that the generator is running stably. After measuring the normal voltage at the input end of the transfer switch in the distribution cabinet, switch the switch to the generator side, observe and confirm that the UPS host is running normally, and disconnect the battery circuit breaker in the battery cabinet.
6. Remove the old battery. Remove the battery from top to bottom on the battery rack. Remove one screw and wrap the connecting wire connector with electrical tape to insulate it well (this step is very important, don’t be lazy) to prevent it from being damaged. The negative pole is short-circuited and dangerous.
7. Remove all batteries, place them in place, and start installing new batteries.
8. Start from 1# according to the battery number, and start installation from the bottom layer of the battery rack. The position and direction are the same as before. The connector screws must be tightened, the connecting wires are neat and the curvature is consistent. There should be appropriate gaps between batteries, and strict precautions should be taken during the connection process. short circuit.
9. After installing the battery, confirm that the positive and negative poles are correct, measure the total voltage, and confirm that the battery is installed and connected correctly.
10. Calculate the charging voltage based on the battery parameters, and measure the UPS output charging voltage, which meets the charging requirements of this batch of batteries. Close the battery cabinet and check the host charging menu. The battery is already charging.
11. Install the battery cabinet, switch the input of the UPS host back to the mains power, and confirm that the input and output voltage of the UPS uninterruptible power supply host is normal. Stop the generator, disconnect the connecting wires, pack the tools, load the old battery into the truck for transportation back, and clean up the site.
Popular recommendation
Lithium battery development
2022-11-1518650 battery 2000mah.What does 18650 lithium battery refer to?
2023-10-13CR1625 battery.LG successfully developed the world's most efficient solar energy storage battery wit
2023-10-0818650 rechargeable battery lithium 3.7v 3500mah.Research on thermal runaway of 18650 lithium battery
2023-10-09button battery 2025.10 major research progresses in ternary materials for lithium-ion batteries
2023-10-081.5v Button battery.Huawei releases new 55W super fast charging technology: Mate X debuts
2023-10-086LR61 alkaline battery.How does temperature change affect the charging and discharging of lithium ba
2023-10-101.2V Ni-MH battery.18650 lithium battery production process
2023-10-09battery aaa alkaline!Exploring the causes and countermeasures of thermal runaway in lithium-ion batt
2023-10-08CR1130 battery.Institute of Advanced Technology makes progress in research and development of flexib
2023-10-089v alkaline battery.Analysis on BYD e6 battery technology
2023-10-08What is the difference between a battery and a lithium battery
2022-11-09